Dabieshan Power Plant Phase III Project-9,400 sqm
Project Overview
The Dabieshan Power Plant Phase III Project is located in the power load center of eastern Hubei Province, covering a total construction area of 9,300 square meters. This project adopted Tseason 75mm glass wool sandwich wall panels, providing excellent insulation, fire resistance, and durability.
Project Background
As one of the key power infrastructure projects in eastern Hubei, the Dabieshan Power Plant plays a crucial role in optimizing regional power distribution and enhancing the stability of the power grid.
The completion of this project will significantly improve the adjustment capacity of the power network, increase operational reliability, and support the formation of the 500KV dual-ring grid in eastern Hubei.
It also helps improve power quality and grid safety, ensuring efficient energy transmission across the region. This project provides a strong energy foundation for sustained economic growth in Hubei Province and the revitalization of the Dabieshan area.
Tseason Solution
For this project, Tseason supplied 75mm glass wool sandwich panels featuring:
- High fire performance (Class A1 non-combustible)
- Superior thermal and acoustic insulation
- Lightweight and easy installation, improving project efficiency
- Weather-resistant PVDF coating for long-term durability and aesthetic consistency
The panels’ ivory white finish complements the industrial architecture, creating a clean, modern appearance while maintaining robust performance in demanding environments.
Project Significance
The Dabieshan Power Plant Phase III Project marks another successful cooperation between Tseason and China’s major energy infrastructure sector. By offering energy-efficient, safe, and eco-friendly enclosure systems, Tseason contributes to sustainable power development and industrial modernization in central China.



